Email:
Tel:
Located at the 4th Division of Xinjiang Construction Corps in Cocodala City, Cocodala Bridge crosses Ili River. The bridge is 2,527m long and 32.5m wide. The main bridge is a 600m prestressed concrete cable-stayed bridge, and a double-column variable cross-section H-shaped tower which is 107.5m high is used. The bridge is built as a two-way four-lane bridge (design speed 80 km/h) according to the first-class highway standard.
Time of completion: June 2019
Product: EXC-P53AP LED pixel dots (120,000 pcs): 6+3 RGBW, 2W, DC36V, spacing: 125mm; EXC-W42B high power LED wall washer (3,500 pcs): RGBW, 24W