As the venue of the 10th Guizhou Games in 2018, Zunyi Olympic Sports Center has a total land area of 410,000㎡, a floor area of 144,000㎡, and an investment of RMB 1.64 billion. It consists of four large single buildings including stadium, gymnasium, swimming pool, and training hall. EXC-LED assists Zunyi Olympic Sports Center in the Landscape Lighting Project and the bidding section includes the gymnasium, swimming pool, training hall, and stadium.
Time of completion: October 2017
Product: EXC-W80 wall washer light (3,000 pcs), EXC-W24 wall washer light (4,000 pcs), EXC-U22NC linear light (3,000 pcs), EXC-P130X pixel light (2,500 pcs)